I-25 SBL over RIO GALLINAS
1.5 MI S OF NM-104 · County 047, New Mexico · Built 1982 · 2 Lanes · 9,446 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
35.573867, -105.213522
This bridge is in worse condition than 76% of bridges in County 047. The average bridge in New Mexico is 0 years old; this one is 44 years old.
Nearby Bridges
I-25 NBL over RIO GALLINAS
Built 1982
I-25 SBL over BNSF RAILROAD
Built 1982
I-25 NBL over BNSF RAILROAD
Built 1982
47-0C23 over GALLINAS RIVER
Built 1982
I-25 SBL over COUNTY RD-21
Built 1982
I-25 NBL over COUNTY RD-21
Built 1982
L-00015 over GALLINAS RIVER
Built 1987
I-25 SBL over LOOP-15/LAS VEGAS
Built 1973
NM-283 over I-25 NBL/SBL
Built 1973
I-25 NBL over LOOP-15/LAS VEGAS
Built 1973
Bridge Details
- Structure #
- 000000000008238
- Year Built
- 1982
- Length
- 88.4 m (290 ft)
- Max Span
- 18 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 9,446
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.