I-25 SBL over BNSF RAILROAD

1.7 MI S OF NM-104 · County 047, New Mexico · Built 1982 · 2 Lanes · 9,446 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000008236
Year Built
1982
Length
55.8 m (183.1 ft)
Max Span
18.3 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
9,446
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$149,000
Total Project Cost
$500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.