I-25 SBL over LOOP-15/LAS VEGAS

SOUTH LAS VEGAS INTERCHNG · County 047, New Mexico · Built 1973 · 2 Lanes · 8,989 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000007333
Year Built
1973
Reconstructed
2008
Length
64 m (210 ft)
Max Span
30.2 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
8,989
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$190,000
Total Project Cost
$370,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.