I-25 SBL over LOOP-15/LAS VEGAS
SOUTH LAS VEGAS INTERCHNG · County 047, New Mexico · Built 1973 · 2 Lanes · 8,989 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.569044, -105.220497
This bridge is in worse condition than 28.6% of bridges in County 047. The average bridge in New Mexico is 0 years old; this one is 53 years old.
Nearby Bridges
NM-283 over I-25 NBL/SBL
Built 1973
I-25 NBL over LOOP-15/LAS VEGAS
Built 1973
I-25 NBL over BNSF RAILROAD
Built 1982
I-25 SBL over BNSF RAILROAD
Built 1982
I-25 SBL over RIO GALLINAS
Built 1982
I-25 NBL over RIO GALLINAS
Built 1982
47-0C23 over GALLINAS RIVER
Built 1982
I-25 SBL over COUNTY RD-21
Built 1982
I-25 NBL over COUNTY RD-21
Built 1982
L-00015 over GALLINAS RIVER
Built 1987
Bridge Details
- Structure #
- 000000000007333
- Year Built
- 1973
- Reconstructed
- 2008
- Length
- 64 m (210 ft)
- Max Span
- 30.2 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 8,989
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $190,000
- Total Project Cost
- $370,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.