NM-3 over ARROYO DEL PUEBLO
4.3 MI S OF I-25 · County 047, New Mexico · Built 1978 · 2 Lanes · 922 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.333283, -105.430861
This bridge is in worse condition than 28.6% of bridges in County 047. The average bridge in New Mexico is 0 years old; this one is 48 years old.
Nearby Bridges
NM-3 over PECOS RIVER
Built 1996
NM-3 over ARROYO DEL CHAMIZAL
Built 1952
47-Z000 over Unnamed Waterway
Built 2008
NM-3 over PECOS RIVER
Built 1974
47B059 over PECOS RIVER
Built 1988
I-25 NB over NM-3
Built 1966
I-25 SB over NM-3
Built 1966
FR-2116 over UNNAMED WATERWAY
Built 1941
FR-2116 over UNNAMED WATERWAY
Built 1941
FR-2116 over UNNAMED WATERWAY
Built 1941
Bridge Details
- Structure #
- 000000000007958
- Year Built
- 1978
- Length
- 9.8 m (32.2 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 922
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.