I-25 SB over NM-3
16.4 MI S US-84/Romerovil · County 047, New Mexico · Built 1966 · 2 Lanes · 7,980 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
35.396544, -105.445292
This bridge is in worse condition than 50.3% of bridges in County 047. The average bridge in New Mexico is 0 years old; this one is 60 years old.
Nearby Bridges
I-25 NB over NM-3
Built 1966
FR-2116 over UNNAMED WATERWAY
Built 1941
FR-2116 over UNNAMED WATERWAY
Built 1941
47-Z000 over Unnamed Waterway
Built 2008
NM-3 over PECOS RIVER
Built 1974
I-25 NB over Pecos River
Built 1966
I-25 SB over Pecos River
Built 1966
FR-2116 over Pecos River
Built 2021
47-B41D over SAN JOSE ARROYO
Built 1923
FR-2116 over UNNAMED WATERWAY
Built 1941
Bridge Details
- Structure #
- 000000000006591
- Year Built
- 1966
- Reconstructed
- 2007
- Length
- 29 m (95.1 ft)
- Max Span
- 11.9 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 7,980
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.