NM-3 over PECOS RIVER
1.7 MI S OF I-25 · County 047, New Mexico · Built 1974 · 2 Lanes · 1,287 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.372847, -105.450433
This bridge is in worse condition than 28.6% of bridges in County 047. The average bridge in New Mexico is 0 years old; this one is 52 years old.
Nearby Bridges
47-Z000 over Unnamed Waterway
Built 2008
NM-3 over ARROYO DEL CHAMIZAL
Built 1952
I-25 NB over NM-3
Built 1966
I-25 SB over NM-3
Built 1966
FR-2116 over UNNAMED WATERWAY
Built 1941
FR-2116 over UNNAMED WATERWAY
Built 1941
I-25 NB over Pecos River
Built 1966
I-25 SB over Pecos River
Built 1966
47-B41D over SAN JOSE ARROYO
Built 1923
I-25 NBL/SBL over LOCAL ROAD
Built 1966
Bridge Details
- Structure #
- 000000000007482
- Year Built
- 1974
- Length
- 52.4 m (171.9 ft)
- Max Span
- 17.4 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 1,287
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.