I-25 NBL/SBL over LOCAL ROAD
18.5 MI N OF SANTA FE C/L · County 047, New Mexico · Built 1966 · 4 Lanes · 10,100 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.400756, -105.477814
This bridge is in worse condition than 28.6% of bridges in County 047. The average bridge in New Mexico is 0 years old; this one is 60 years old.
Nearby Bridges
47-B41D over SAN JOSE ARROYO
Built 1923
I-25 SB over Pecos River
Built 1966
I-25 NB over Pecos River
Built 1966
FR-2116 over Pecos River
Built 2021
FR-2123 over I-25 NBS/SBL
Built 1966
47-B41A over PECOS RIVER
Built 1999
I-25 SB over NM-3
Built 1966
I-25 NB over NM-3
Built 1966
FR-2116 over UNNAMED WATERWAY
Built 1941
FR-2116 over UNNAMED WATERWAY
Built 1941
Bridge Details
- Structure #
- 000000000006724
- Year Built
- 1966
- Length
- 10.4 m (34.1 ft)
- Max Span
- 7.6 m
- Lanes
- 4
- Daily Traffic
- 10,100
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $282,000
- Total Project Cost
- $423,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.