FL-4727 over US-84 NBL/SBL
0.1 MI N OF JCT I-25/US84 · County 049, New Mexico · Built 1974 · 2 Lanes · 7,607 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.636625, -105.930311
This bridge is in worse condition than 64.3% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 52 years old.
Nearby Bridges
NM-466 over I-25 NBLS/SBL
Built 1974
NM-466 over ARROYO CHAMISO
Built 1946
FL-5734 over UNNAMED WATERWAY
Built 2002
I-25 NBL over Arroyo Hondo Channel
Built 1975
I-25 SBL over Arroyo Hondo Channel
Built 1975
NM-300 over ARROYO HONDO
Built 1946
I-25 NBL over ARROYO HONDO RD
Built 1975
I-25 SBL over ARROYO HONDO RD
Built 1975
I-25 NBL over US-84-285 St Francis Dr
Built 1974
I-25 NBL over US-84-285
Built 1974
Bridge Details
- Structure #
- 000000000007508
- Year Built
- 1974
- Length
- 79 m (259.2 ft)
- Max Span
- 27.7 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 7,607
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $490,000
- Total Project Cost
- $735,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.