I-25 NBL over US-84-285
JUNCTION I-25/ST FRANCIS · County 049, New Mexico · Built 1974 · 2 Lanes · 15,535 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.634947, -105.954403
This bridge is in worse condition than 64.3% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 52 years old.
Nearby Bridges
I-25 NBL over US-84-285 St Francis Dr
Built 1974
I-25 SBL over US-84-285 UNDER RAMP C
Built 1974
I-25 SBL over US-84-285
Built 1974
I-25 SBL over SF Southern R/R
Built 1974
US-84 over UNNAMED WATERWAY
Built 1973
I-25 NBL over SF Southern R/R
Built 1974
FL-5734 over UNNAMED WATERWAY
Built 2002
I-25 SBL over NMRX
Built 2009
US-84/285 NBL over ARROYO CHAMISOS
Built 1973
US-84/285 SBL over ARROYO CHAMISOS
Built 1973
Bridge Details
- Structure #
- 000000000007503
- Year Built
- 1974
- Length
- 86.6 m (284.1 ft)
- Max Span
- 28.3 m
- Width
- 15.8 m (51.8 ft)
- Lanes
- 2
- Daily Traffic
- 15,535
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $100,000
- Total Project Cost
- $300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.