I-25 SBL over US-84-285 UNDER RAMP C
5.1 M N Jct NM-14/I-25 · County 049, New Mexico · Built 1974 · 2 Lanes · 16,197 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
35.635572, -105.954575
This bridge is in worse condition than 83.1% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 52 years old.
Nearby Bridges
I-25 NBL over US-84-285
Built 1974
I-25 NBL over US-84-285 St Francis Dr
Built 1974
I-25 SBL over US-84-285
Built 1974
US-84 over UNNAMED WATERWAY
Built 1973
I-25 SBL over SF Southern R/R
Built 1974
I-25 NBL over SF Southern R/R
Built 1974
FL-5734 over UNNAMED WATERWAY
Built 2002
I-25 SBL over NMRX
Built 2009
US-84/285 NBL over ARROYO CHAMISOS
Built 1973
US-84/285 SBL over ARROYO CHAMISOS
Built 1973
Bridge Details
- Structure #
- 000000000007507
- Year Built
- 1974
- Length
- 53 m (173.9 ft)
- Max Span
- 24.4 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 16,197
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $394,000
- Total Project Cost
- $591,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.