US-84/285 NBL over ARROYO CHAMISOS

1.06 MI N OF JCT I-25 · County 049, New Mexico · Built 1973 · 3 Lanes · 42,473 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000007334
Year Built
1973
Length
30.4 m (99.7 ft)
Max Span
11.6 m
Width
14 m (45.9 ft)
Lanes
3
Daily Traffic
42,473
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.