I-25 NBL over ARROYO HONDO RD

2.77 M N OF ST FRANCIS DR · County 049, New Mexico · Built 1975 · 2 Lanes · 24,998 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000000007370
Year Built
1975
Length
42.1 m (138.1 ft)
Max Span
16.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
24,998
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.