FR2106 over I-25 SBL and NBL
4.24 M N I-25/ST FRANCIS · County 049, New Mexico · Built 1975 · 2 Lanes · 842 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.601208, -105.909544
This bridge is in worse condition than 64.3% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 51 years old.
Nearby Bridges
NM-300 over UNNAMED WATERWAY
Built 1946
NM-300 over UNNAMED WATERWAY
Built 1946
I-25 NBL/SBL over CANADA ANCHA
Built 1974
FR2105 over I-25 NBLS/SBLS
Built 1975
49-067A over ARROYO HONDO
Built 1979
I-25 SBL over ARROYO HONDO RD
Built 1975
I-25 NBL over ARROYO HONDO RD
Built 1975
I-25 NBL over Arroyo Hondo Channel
Built 1975
I-25 SBL over Arroyo Hondo Channel
Built 1975
NM-300 over ARROYO HONDO
Built 1946
Bridge Details
- Structure #
- 000000000007373
- Year Built
- 1975
- Length
- 61.6 m (202.1 ft)
- Max Span
- 30.5 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 842
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $484,000
- Total Project Cost
- $727,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.