I-25 NBL over Rio Grande IrriI. Canal

11.0 M N Jct NM-6/I-25 · County 001, New Mexico · Built 1973 · 2 Lanes · 38,811 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000007354
Year Built
1973
Reconstructed
1991
Length
705.3 m (2314 ft)
Max Span
25.6 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
38,811
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.