IRR/I-25 NBL over Arenal Canal

9.9 Mi N Jct I-25 / NM-6 · County 001, New Mexico · Built 1973 · 2 Lanes · 30,896 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000007321
Year Built
1973
Reconstructed
1996
Length
38.4 m (126 ft)
Max Span
17.4 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
30,896
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$140,000
Total Project Cost
$300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.