NM-47 SBL over I-25 NBL and SBL
NM-47 SB Over I-25 · County 001, New Mexico · Built 1973 · 2 Lanes · 19,512 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.95265, -106.664456
This bridge is in worse condition than 28% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 53 years old.
Nearby Bridges
I-25 NBL over NM-47 South Broadway
Built 1973
NM-47 over I-25 Exit Ramp to N NM47
Built 1973
I-25 SBL over NM-47 NBL
Built 1973
NM-47 NBL over I-25 Exit Ramp to NM47 S
Built 1973
I-25 SBL over BNSF Railroad
Built 1973
I-25 NBL over BNSF Railroad
Built 1973
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1973
I-25 SBL over Rio Grande Irri. Canal
Built 1973
I-25 NBL over Rio Grande IrriI. Canal
Built 1973
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1973
Bridge Details
- Structure #
- 000000000007359
- Year Built
- 1973
- Reconstructed
- 2005
- Length
- 93.3 m (306.1 ft)
- Max Span
- 30.8 m
- Width
- 17.4 m (57.1 ft)
- Lanes
- 2
- Daily Traffic
- 19,512
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $590,000
- Total Project Cost
- $900,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.