I-40 WBL over EMBUDO ARROYO
3.8 MI E Jct I-40/I-25 · County 001, New Mexico · Built 1962 · 3 Lanes · 114,255 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
35.095639, -106.56385
This bridge is in worse condition than 80.8% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 64 years old.
Nearby Bridges
IN-4162 over Off Ramp to Louisiana
Built 2005
FL-5061 over Embudo Arroyo
Built 1974
FL-5061 over I-40EB/WB/ Embudo Arroyo
Built 2005
FL-4057 over I-40 EB and WB
Built 2005
FL-5150 over Embudo Arroyo
Built 1977
FL-4061 over Embudo Arroyo
Built 1978
FL-4061 over I-40 EBL and WBL
Built 1999
FL-4053 over I-40 and Embudo Arroyo
Built 1989
FL-4053 over UNNAMED WATERWAY
Built 1963
I-40 WB over Unnamed Waterway
Built 1963
Bridge Details
- Structure #
- 000000000006347
- Year Built
- 1962
- Length
- 11.9 m (39 ft)
- Max Span
- 3 m
- Lanes
- 3
- Daily Traffic
- 114,255
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $585,000
- Total Project Cost
- $877,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.