FL-4061 over I-40 EBL and WBL
4.8 M E Jct I-25/I-40 · County 001, New Mexico · Built 1999 · 10 Lanes · 28,402 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
35.090061, -106.550753
This bridge is in worse condition than 80.8% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 27 years old.
Nearby Bridges
I-40 EBL over UNNAMED WATERWAY
Built 1960
FL-4040 over I-40 EB/WB/Waterway
Built 1993
I-40 WBL over EMBUDO ARROYO
Built 1960
FL-5061 over I-40EB/WB/ Embudo Arroyo
Built 2005
FL-5150 over Embudo Arroyo
Built 1977
FL-4061 over Embudo Arroyo
Built 1978
IN-4164 over UNNAMED WATERWAY
Built 1960
FL-5061 over Embudo Arroyo
Built 1974
I-40 WBL over EMBUDO ARROYO
Built 1962
FL-5050 over Embudo Arroyo
Built 1977
Bridge Details
- Structure #
- 000000000009070
- Year Built
- 1999
- Length
- 78 m (255.9 ft)
- Max Span
- 38.7 m
- Width
- 42.1 m (138.1 ft)
- Lanes
- 10
- Daily Traffic
- 28,402
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.