FL-4053 over I-40 and Embudo Arroyo
2.98 M E of Jct I-25/I-40 · County 001, New Mexico · Built 1989 · 4 Lanes · 16,653 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.100881, -106.577567
This bridge is in worse condition than 28% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 37 years old.
Nearby Bridges
FL-4053 over UNNAMED WATERWAY
Built 1963
I-40 WB over Unnamed Waterway
Built 1963
FL-4057 over I-40 EB and WB
Built 2005
San Mateo Blvd. over I-40 and Embudo arroyo
Built 2009
IN-4162 over Off Ramp to Louisiana
Built 2005
I-40 WBL over EMBUDO ARROYO
Built 1963
I-40 WBL over EMBUDO ARROYO
Built 1962
FL 5083 over I-40 EB and WB
Built 2007
FL-5061 over Embudo Arroyo
Built 1974
FL-5083 over Embudo Arroyo
Built 1969
Bridge Details
- Structure #
- 000000000008650
- Year Built
- 1989
- Length
- 88.4 m (290 ft)
- Max Span
- 43.3 m
- Width
- 19.2 m (63 ft)
- Lanes
- 4
- Daily Traffic
- 16,653
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $876,000
- Total Project Cost
- $1,315,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.