55-B007 over RIO GRANDE
4.0 Mi W of Jct NM-522 · County 055, New Mexico · Built 1951 · 2 Lanes · 250 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
36.535211, -105.708581
This bridge is in worse condition than 69.9% of bridges in County 055. The average bridge in New Mexico is 0 years old; this one is 75 years old.
Nearby Bridges
55-B007 over RIO HONDO
Built 2023
55-B005 over RIO HONDO
Built 1973
55-B002 over RIO HONDO
Built 1975
NM-522 over ARROYO HONDO
Built 1947
US-64 over UNNAMED WATERWAY
Built 1964
NM-522 over UNNAMED WATERWAY
Built 1947
US-64 over RIO GRANDE RIVER
Built 1965
NM-522 over SAN CRISTOBAL CREEK
Built 1951
55-0114 over RIO GRANDE DE RANCHOS
Built 1986
55-001 over RIO HONDO
Built 1959
Bridge Details
- Structure #
- 000000000005243
- Year Built
- 1951
- Length
- 50 m (164 ft)
- Max Span
- 30.5 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $148,000
- Total Project Cost
- $223,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.