NM-522 over ARROYO HONDO
6.9 MI N OF JCT US-64 · County 055, New Mexico · Built 1947 · 2 Lanes · 3,991 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
36.535194, -105.666783
This bridge is in worse condition than 59.1% of bridges in County 055. The average bridge in New Mexico is 0 years old; this one is 79 years old.
Nearby Bridges
55-B002 over RIO HONDO
Built 1975
55-B005 over RIO HONDO
Built 1973
55-B007 over RIO HONDO
Built 2023
55-0114 over RIO GRANDE DE RANCHOS
Built 1986
55-B007 over RIO GRANDE
Built 1951
NM-522 over UNNAMED WATERWAY
Built 1947
NM-522 over SAN CRISTOBAL CREEK
Built 1951
US-64 over UNNAMED WATERWAY
Built 1964
US-64 over RIO GRANDE RIVER
Built 1965
55-001 over RIO HONDO
Built 1959
Bridge Details
- Structure #
- 000000000003463
- Year Built
- 1947
- Reconstructed
- 1983
- Length
- 31.4 m (103 ft)
- Max Span
- 14.9 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 3,991
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $232,000
- Total Project Cost
- $348,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.