55-001 over RIO HONDO
S of JCT NM 150 / NM 230 · County 055, New Mexico · Built 1959 · 1 Lanes · 250 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
36.538208, -105.561433
This bridge is in worse condition than 59.1% of bridges in County 055. The average bridge in New Mexico is 0 years old; this one is 67 years old.
Nearby Bridges
NM-150 over RIO HONDO
Built 1972
55-0114 over RIO GRANDE DE RANCHOS
Built 1986
IRR BIA RTE 709 over LUCERO CREEK
Built 1978
NM-522 over ARROYO HONDO
Built 1947
55-B002 over RIO HONDO
Built 1975
IRR BIA RTE 708 over DRY CREEK
Built 1994
NM-522 over SAN CRISTOBAL CREEK
Built 1951
NM-522 over UNNAMED WATERWAY
Built 1947
55-B005 over RIO HONDO
Built 1973
IRR BIA RTE 700 over RIO PUEBLO DE TAOS
Built 1981
Bridge Details
- Structure #
- 000000000006047
- Year Built
- 1959
- Length
- 9.9 m (32.5 ft)
- Max Span
- 8.8 m
- Width
- 4.5 m (14.8 ft)
- Lanes
- 1
- Daily Traffic
- 250
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $20,000
- Total Project Cost
- $31,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.