NM-154 over RIO GRANDE
1.7 MI E OF NM-185/HATCH · County 013, New Mexico · Built 1941 · 2 Lanes · 924 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
32.667956, -107.119281
This bridge is in worse condition than 88.9% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 85 years old.
Nearby Bridges
13-Z019 over RINCON CANAL
Built 1962
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1966
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
NM-154 over UNNAMED WATERWAY
Built 1947
NM-185 over Angustora Arroyo
Built 2011
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1966
13-0000 over COLORADO DRAIN
Built 1982
NM-26 over RIO GRANDE
Built 1965
NM-26 over I-25 NBL/SBL
Built 1964
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
Bridge Details
- Structure #
- 000000000004264
- Year Built
- 1941
- Length
- 145.1 m (476 ft)
- Max Span
- 10.4 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 924
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $546,000
- Total Project Cost
- $819,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.