NM-26 over I-25 NBL/SBL
Jct. I-25 and NM-26 · County 013, New Mexico · Built 1964 · 2 Lanes · 2,185 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.683369, -107.154539
This bridge is in worse condition than 64% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 62 years old.
Nearby Bridges
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
NM-26 over RIO GRANDE
Built 1965
I-25 SBL/NBL over UNNAMED WATERWAY
Built 1965
NM-187 over PLACITAS ARROYO
Built 2009
13-0000 over COLORADO DRAIN
Built 1982
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
NM-26 over PLACITAS ARROYO
Built 1969
NM-187 over RIO GRANDE
Built 2000
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1966
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
Bridge Details
- Structure #
- 000000000006483
- Year Built
- 1964
- Length
- 69.8 m (229 ft)
- Max Span
- 15.8 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 2,185
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $346,000
- Total Project Cost
- $519,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.