NM-26 over RIO GRANDE
0.9 MI N JCT NM-185/HATCH · County 013, New Mexico · Built 1965 · 2 Lanes · 3,637 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.679156, -107.155397
This bridge is in worse condition than 64% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 61 years old.
Nearby Bridges
NM-26 over I-25 NBL/SBL
Built 1964
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
NM-187 over PLACITAS ARROYO
Built 2009
13-0000 over COLORADO DRAIN
Built 1982
I-25 SBL/NBL over UNNAMED WATERWAY
Built 1965
NM-26 over PLACITAS ARROYO
Built 1969
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
NM-187 over RIO GRANDE
Built 2000
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1966
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
Bridge Details
- Structure #
- 000000000006484
- Year Built
- 1965
- Length
- 210.7 m (691.3 ft)
- Max Span
- 17.5 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 3,637
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,040,000
- Total Project Cost
- $1,560,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.