I-93 NB over E BR PEMIGEWASSET RIVER

0.5 MI LINCOLN TL · County 009, New Hampshire · Built 1972 · 2 Lanes · 7,160 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
028401770016100
Year Built
1972
Length
111.3 m (365.2 ft)
Max Span
41.5 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
7,160
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.