I-93 NB over NH112 NHRR

0.29 MI LINCOLN TL · County 009, New Hampshire · Built 1972 · 2 Lanes · 7,160 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
028401750016300
Year Built
1972
Reconstructed
2010
Length
45.7 m (149.9 ft)
Max Span
43.9 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
7,160
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.