US 3 over LOST RIVER

5.6 MI FROM THORNTON TL · County 009, New Hampshire · Built 1931 · 2 Lanes · 2,784 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
028401710015300
Year Built
1931
Length
21 m (68.9 ft)
Max Span
21 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,784
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.