I-93 SB over E BR PEMIGEWASSET RIVER

0.5 MI LINCOLN TL · County 009, New Hampshire · Built 1972 · 2 Lanes · 7,285 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
028401760016000
Year Built
1972
Length
86.3 m (283.1 ft)
Max Span
32.3 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
7,285
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000