COLLEGE ROAD over WILLEY BROOK

0.42MI NH28 · County 003, New Hampshire · Built 2002 · 2 Lanes · 578 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
028301760009900
Year Built
2002
Length
8.8 m (28.9 ft)
Max Span
8.2 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
578
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.