NH 28 over CSX(ABD)
1.6 MI WOLFEBORO T.L. · County 003, New Hampshire · Built 1959 · 2 Lanes · 4,556 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
43.691575, -71.117628
This bridge is in worse condition than 21.2% of bridges in County 003. The average bridge in New Hampshire is 0 years old; this one is 67 years old.
Nearby Bridges
GRANITE ROAD over PINE RIVER
Built 2004
NH 16 over PINE RIVER
Built 1976
NH 16 over PINE RIVER
Built 1930
TUFTONBORO ROAD over BEECH RIVER
Built 1928
DRAKE ROAD over WILKINSON BROOK
Built 1930
TUFTONBORO ROAD over BEECH RIVER
Built 1997
ELM STREET over PINE RIVER
Built 1983
ANNIE NICHOLS ROAD over DAN HOLE RIVER
Built 1994
NH 16B over BEECH RIVER
Built 1932
NH 16 over NH 25
Built 1969
Bridge Details
- Structure #
- 020401940014600
- Year Built
- 1959
- Reconstructed
- 2021
- Length
- 32.3 m (106 ft)
- Max Span
- 12.2 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 4,556
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.