CASTLE HILL ROAD over BEAVER BROOK

0.02 MI FR PELHAM TL · County 015, New Hampshire · Built 2021 · 2 Lanes · 279 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
028000570005100
Year Built
2021
Length
7.9 m (25.9 ft)
Max Span
7.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
279
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.