NH128 over BEAVER BROOK

WINDHAM TL · County 011, New Hampshire · Built 1935 · 2 Lanes · 4,824 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
020500670016000
Year Built
1935
Reconstructed
2002
Length
10.4 m (34.1 ft)
Max Span
9.1 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
4,824
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.