NH111A over BEAVER BROOK

.43 MI N PELHAM VILLAGE · County 011, New Hampshire · Built 1966 · 2 Lanes · 6,245 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
020501050009900
Year Built
1966
Length
16.5 m (54.1 ft)
Max Span
14.6 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
6,245
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.