NH128 over BEAVER BROOK

WINDHAM T.L. · County 015, New Hampshire · Built 1934 · 2 Lanes · 9,150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015401660002100
Year Built
1934
Reconstructed
1993
Length
9.6 m (31.5 ft)
Max Span
8.5 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
9,150
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.