ABIJAH BRIDGE ROAD over LAKE HORACE
0.5 MI FROM DEERING TL · County 011, New Hampshire · Built 2009 · 1 Lanes · 96 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.083539, -71.787458
This bridge is in worse condition than 17.7% of bridges in County 011. The average bridge in New Hampshire is 0 years old; this one is 17 years old.
Nearby Bridges
ABIJAH BRIDGE ROAD over DUDLEY BROOK
Built 1999
NH149 over PISCATAQUOG RIVER
Built 1939
BARTLETT HILL ROAD over PISCATAQUOG RIVER
Built 1930
RESERVOIR DRIVE over PISCATAQUOG RIVER
Built 1994
RESERVOIR DRIVE over PISCATAQUOG RIVER
Built 1993
J CONNOR ROAD over PISCATAQUOG RIVER
Built 2003
NH 77 NH114 over PISCATAQUOG RIVER
Built 1939
WOODBURY ROAD over PISCATAQUOG RIVER
Built 1940
PLEASANT POND ROAD over PISCATAQUOG RIVER
Built 1939
PERKINS POND ROAD over PEACOCK BROOK
Built 1998
Bridge Details
- Structure #
- 026700380012400
- Year Built
- 2009
- Length
- 16.8 m (55.1 ft)
- Max Span
- 15.8 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 1
- Daily Traffic
- 96
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.