BARTLETT HILL ROAD over PISCATAQUOG RIVER

2.0MI WEARE TL · County 011, New Hampshire · Built 1930 · 2 Lanes · 96 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
006101470005700
Year Built
1930
Reconstructed
1991
Length
8.2 m (26.9 ft)
Max Span
7.3 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
96
Material
Wood or Timber
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.