RESERVOIR DRIVE over PISCATAQUOG RIVER

0.10 MI FR PAGE HILL RD · County 011, New Hampshire · Built 1994 · 2 Lanes · 1,371 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
026700600015600
Year Built
1994
Length
29.6 m (97.1 ft)
Max Span
28 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
1,371
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.