STUDIO ROAD over BAKER RIVER

0.10MI NH25 · County 009, New Hampshire · Built 1976 · 2 Lanes · 125 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
026401180008500
Year Built
1976
Length
28.7 m (94.2 ft)
Max Span
26.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
125
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.