NH118 over BAKER RIVER

0.9 MI FROM JCT RTE 25 · County 009, New Hampshire · Built 1947 · 2 Lanes · 1,732 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
026401330010300
Year Built
1947
Length
23.5 m (77.1 ft)
Max Span
21.3 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
1,732
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.