NH 25 NH118 over BAKER RIVER

5.8 MI FROM BENTON TL · County 009, New Hampshire · Built 1962 · 2 Lanes · 3,727 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
026401200007000
Year Built
1962
Reconstructed
2006
Length
32.9 m (107.9 ft)
Max Span
31.1 m
Width
15.3 m (50.2 ft)
Lanes
2
Daily Traffic
3,727
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000