NH 25 NH118 over BAKER RIVER

AT WENTWORTH TOWNLINE · County 009, New Hampshire · Built 2006 · 2 Lanes · 2,141 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
026401100004700
Year Built
2006
Length
49.6 m (162.7 ft)
Max Span
48 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
2,141
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.