NH109 over SALMON FALLS RIVER

NH-ME STATE LINE · County 003, New Hampshire · Built 1962 · 2 Lanes · 789 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
026102100013900
Year Built
1962
Reconstructed
1992
Length
8.5 m (27.9 ft)
Max Span
7.6 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
789
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.