LEBANON STREET over SALMON FALLS RIVER

NH.-ME. SL · County 017, New Hampshire · Built 1920 · 2 Lanes · 557 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
017300810015900
Year Built
1920
Reconstructed
1998
Length
9.9 m (32.5 ft)
Max Span
8.2 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
557
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.