NH153 over BRANCH RIVER

3.1 MI N MILTON TL · County 003, New Hampshire · Built 1932 · 2 Lanes · 2,529 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
026102450006600
Year Built
1932
Reconstructed
1992
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
2,529
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.