CANAL ROAD over GREAT EAST LAKE OUTLET

TOWN RD MAINE SL · County 003, New Hampshire · Built 1920 · 2 Lanes · 665 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
026101860011800
Year Built
1920
Reconstructed
2021
Length
12.2 m (40 ft)
Max Span
10.2 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
665
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.