WHITTIER ROAD over STONY BROOK

5.7 MI E TAMWORTH TL · County 003, New Hampshire · Built 2016 · 2 Lanes · 448 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
025201630013200
Year Built
2016
Length
8.2 m (26.9 ft)
Max Span
7.7 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
448
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.