NH113 over BEARCAMP RIVER

JCT NH113/OLD NH 25 · County 003, New Hampshire · Built 2018 · 2 Lanes · 2,263 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
025201500010500
Year Built
2018
Length
42.4 m (139.1 ft)
Max Span
40.5 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
2,263
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000