NH113 over SWIFT RIVER

1.2 MI NE JCT NH 25 · County 003, New Hampshire · Built 1987 · 2 Lanes · 2,249 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
025201300011100
Year Built
1987
Length
29.3 m (96.1 ft)
Max Span
28 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
2,249
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.