I-89 NB over GILE POND ROAD

3.7MI NEW LONDON T.L. · County 013, New Hampshire · Built 1967 · 2 Lanes · 9,459 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
025001300011700
Year Built
1967
Length
17.7 m (58.1 ft)
Max Span
15.2 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
9,459
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.